
# Location
#
# Built
Up Area Plan #
* For
2 Bedroom Flat *
* For
3 Bedroom Flat *
# Terms & Conditions #
# Specifications#
|
|
V.B. Park (Sold Out) |
|
VB Park,
final statement of excellence in real estate design
and construction. Located at Kakkanad, in the idyllic
outskirts of Cochin.
|
 |
|
Specifications
of Work
|
| Civil |
Drawing/Dining,
Bedroom, Kitchen, Balcony, Bathroom. |
| Wall |
Cement
plastered putty finished and finished with
2 coats of acrylic emulsion. |
| Floor |
Ceramic
Tiles. |
| Ceiling |
Combination
plastered and finished with 2 coats of lime Wash. |
Kitchen
|
- Hearth Slab will be of Marble finish.
- Stainless steel Kitchen sink.
- White glazed tiles finish up to 1' 6" above kitchen slab.
- C.P. Tap for Kitchen and work area.
- An additional slab shall be provided above
the kitchen slab.
|
| Bathroom |
- Side wall of bath-room shall be provided
with white glazed tiles upto a height of
5".
- Bathrooms shall be provided with Cera or equivalent quality white European Closet
and 18" & 12" wash basins.
- PVC Flush Tank shall be provided.
- C.P.Shower and shower arm shall be provided.
- C.P Basin taps shall be provided for wash
basins .
|
Electrical
Work
(Entire work shall be concealed)and following
points shall be provided. |
| test data |
Light
points |
Fan
Points |
5
amps |
15
amps |
| Liv/Din |
4 |
2 |
1 |
1 |
| Bedroom |
2 |
1 |
1 |
- |
| Kitchen |
2 |
1 |
1 |
1 |
| Balcony |
1 |
- |
- |
- |
| Work
area |
1 |
- |
- |
- |
| Bathroom |
1 |
- |
1 |
- |
| |
|
| Windows |
Wooden. |
| Doors |
| Entrance
Door |
Panelled
doors of hard wood |
| Toilets |
Syntex
doors |
| All
other inside doors |
Laminated
by paneled |
|
|
|
TERMS
AND CONDITIONS
|
| 1 |
All
attempts would be made to complete the project ahead
of schedule, in case of earlier completion, the
allotees are entitled to take possession of their
apartments on payment of entire balance amount. |
| 2 |
Buit
up areas include share in common and service areas. |
| 3 |
Contract
Value of the apartment is firm and final. |
| 4 |
All
statutory obligations arising out of purchase/sale
of the apartment or on taking possession shall
be borne by the allottee. Stamp duties, statutory
fees
for registration of documents, indiviual Electricity
Meter deposits, sales tax and any other state/central
taxes that exist or that may be introduced during
the course of construction of appartments, |
| 5 |
Outstation
payments may please be made by Demand Draft,payable
at Ernakulam and drawn on Bavasons Constructions
Private Limited, Ernakulam. |
| 6 |
The
management reserves the right of allotment/rejection
without assigning any reason whatsoever. |
| 7 |
For
any additional work or change in specifications,
the cost will have to be paid in advance. |
| 8 |
The
builder retains the right to modify or change
the
elevation of the building. |
|
|